Transmission beyond capacity 2.6T required by 2040 LPU connections + 5 yrs/none Many LPU outright declined Loadshedding, 43% uptime Client cost on grid upgrades
Solar Limitations
Not practical or viable 20 Ha/station footprint 10.4 MW Solar for same output 14-16 hours/day no generation Massive storage required Winter output drop by 30-40%
Modular Solution
Baseload power 24×7 Less than 1% of Solar footprint Scaled to any size as required Unaffected by weather Minimal maintenance No fuel required 18 month delivery window
Technology
Baseload power 24×7 Less than 1% of Solar footprint Scaled to any size as required Unaffected by weather Minimal maintenance No fuel required 18 month delivery window
Franchise
Modular Isotopic Tech (MIT) Baseload power production Ultra low energy cost Distributed partner margins Global patents/limited supply + US$ 10B US gov support Stellantis Fortune 500 client